首页 | 本学科首页   官方微博 | 高级检索  
     

高速公路软土路基工后沉降推算方法的比较
引用本文:周林.高速公路软土路基工后沉降推算方法的比较[J].山西建筑,2009,35(5).
作者姓名:周林
作者单位:中国华西工程设计建设有限公司,四川,成都,610031
摘    要:采用双曲线法和星野法对某高速公路软土路基典型断面进行工后沉降推算,并根据实测数据进行推算误差分析,得出这两种方法的适用性以及双曲线法的起始时间点的选取方法.

关 键 词:高速公路  软土路基  星野法  双曲线法  沉降推算

Comparison of post-construction settlement prediction method of expressway soft soil roadbed
ZHOU Lin.Comparison of post-construction settlement prediction method of expressway soft soil roadbed[J].Shanxi Architecture,2009,35(5).
Authors:ZHOU Lin
Abstract:The author carries out the post-construction settlement prediction of the typical section of the expressway soft soil roadbed by using the Hushino method and the hyperbolic method,and analyzes the prediction error based on the measured data,obtains the applicability of two methods and the selection method of the starting time of the hyperbolic method.
Keywords:expressway  soft soil roadbed  Hushino method  hyperbolic method  settlement prediction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号