首页 | 本学科首页   官方微博 | 高级检索  
     

深井降水设计与施工若干问题探讨
引用本文:朱明忠,施淑芬,王春雨. 深井降水设计与施工若干问题探讨[J]. 探矿工程(岩土钻掘工程), 2009, 36(2): 35-38
作者姓名:朱明忠  施淑芬  王春雨
作者单位:黑龙江省齐齐哈尔矿产勘查开发总院,黑龙江,齐齐哈尔,161006
摘    要:探讨深井降水布井原则、设计参数的选择与计算等问题;分析深井降水对周围环境的影响并提出防范措施;总结深井降水施工方面的经验.

关 键 词:基坑开挖  深井降水  降深

Discussion on Design and Construction for Dewatering in Deep Well
ZHU Ming-zhong,SHI Shu-fen and WANG Chun-yu. Discussion on Design and Construction for Dewatering in Deep Well[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2009, 36(2): 35-38
Authors:ZHU Ming-zhong  SHI Shu-fen  WANG Chun-yu
Affiliation:Heilongjian Qiqihar Institute of Geo-exploration and Mineral Development;Heilongjian Qiqihar Institute of Geo-exploration and Mineral Development;Heilongjian Qiqihar Institute of Geo-exploration and Mineral Development
Abstract:The paper discussed the principle of well distribution for deep well dewatering, selection and calculation of design parameters; analyzed influence on the environment by deep well dewatering and put forward the preventive measure; and summed up the experience in construction of deep well dewatering.
Keywords:foundation pit excavation   deep well dewatering   lowering depth
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《探矿工程(岩土钻掘工程)》浏览原始摘要信息
点击此处可从《探矿工程(岩土钻掘工程)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号