首页 | 本学科首页   官方微博 | 高级检索  
     

低透气性突出煤层巷道快速掘进的试验研究
引用本文:刘健,刘泽功,石必明.低透气性突出煤层巷道快速掘进的试验研究[J].煤炭学报,2007,32(8):827-831.
作者姓名:刘健  刘泽功  石必明
作者单位:安徽理工大学 资源开发与管理工程系,安徽 淮南,232001
基金项目:国家自然科学基金重点资助项目(50534090),国家自然科学基金面上项目(50674004),安徽省教育厅自然科学研究项目(2006kj013B)
摘    要:针对在低透气性突出煤层巷道掘进过程中,煤与瓦斯突出综合检测指标经常超限,掘进速度缓慢等问题,提出了深孔预裂控制爆破和巷帮钻孔边抽边掘相结合的综合防突技术,研究了深孔预裂控制爆破技术的作用机理,阐述了深孔预裂控制爆破技术的工艺流程和巷帮钻孔的布置参数.研究表明:在低透气性突出煤层中采用深孔预裂控制爆破和巷帮钻孔边抽边掘相结合的防突措施,可有效地消除激发突出的应力和煤体结构的不均匀性,提高煤体强度和煤层透气性,使巷帮钻孔瓦斯抽放量大幅度地提高,增大了煤体抑制突出的阻力,能有效地预防和消除在掘进过程中煤与瓦斯突出的危险性,且提高巷道掘进速度3~4倍.

关 键 词:低透气性突出煤层  巷道掘进  深孔预裂控制爆破  边抽边掘  
文章编号:0253-9993(2007)08-0827-05
收稿时间:2006-09-05
修稿时间:2006-09-05

Study on the roadway excavation rapidly in the low permeability outburst coal seam
LIU Jian,LIU Ze-gong,SHI Bi-ming.Study on the roadway excavation rapidly in the low permeability outburst coal seam[J].Journal of China Coal Society,2007,32(8):827-831.
Authors:LIU Jian  LIU Ze-gong  SHI Bi-ming
Affiliation:Department of Resources Exploitation and Management, Anhui University of Science and Technology, Huainan 232001, China
Abstract:In view of during excavating the roadway in the low permeability outburst coal seam, the composite index of coal and gas outburst often went beyond and speed of excavation was very slow, the comprehensive outburst prevention technology with deep-hole pre-splitting-control blasting and joint excavation and gas drainage was put forward, and its mechanism was studied at length. At the same time expatiated process of deep-hole pre-splitting control blasting and layout parameters of hole in gateway. The experimental results show that while excavating the roadway in the low permeability outburst coal seam, the inspiring outburst stress and asymmetry of coal mass are elimi- nated, the coal strength, permeability and the resistance to outburst coal are increased and gas drainage volume is increased dramatically after the comprehensive outburst prevention measure is taken. The measure has a potential effect on preventing and eliminating coal and gas outburst while conducting roadway excavation, and the roadway driving speed is increased by 3 -4 times.
Keywords:low permeability outburst coal seam  roadway excavation  deep-hole pre-splitting control blasting  joint excavation and gas drainage
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《煤炭学报》浏览原始摘要信息
点击此处可从《煤炭学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号