首页 | 本学科首页   官方微博 | 高级检索  
     

海外工程机械台班费确定方法探讨
引用本文:王 霜. 海外工程机械台班费确定方法探讨[J]. 山西建筑, 2014, 0(12): 266-267
作者姓名:王 霜
作者单位:中铁工程设计咨询集团有限公司,北京100055
摘    要:针对借助国内施工机械台班费用定额确定海外工程机械台班单价的现状,结合若干实例,提出了确定海外工程机械台班单价的三种方法,探讨了各种方法的优缺点,为海外工程投标报价提供了参考。

关 键 词:海外工程  投标报价  机械台班费

Discussion on the determination method of machine-shift cost in overseas engineering
WANG Shuang. Discussion on the determination method of machine-shift cost in overseas engineering[J]. Shanxi Architecture, 2014, 0(12): 266-267
Authors:WANG Shuang
Affiliation:WANG Shuang (China Railway Engineering Consulting Group Limited Company, Beijing 100055, China)
Abstract:According to the present situation of using domestic construction machine-shift cost to determine overseas engineering machine-shift u- nit price, combining with several examples, put forward three methods for determining the overseas engineering machine-shift unit price, dis- cussed the advantages and disadvantages of various methods, provided reference for tender offer of overseas project.
Keywords:overseas engineering   tender offer   machine-shift cost
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号