京南水利枢纽发电厂溢流坝工作闸门节间及底水封漏水处理
引用本文:陈芳华. 京南水利枢纽发电厂溢流坝工作闸门节间及底水封漏水处理[J]. 大坝与安全, 2004, 0(6): 64-65,68
作者姓名:陈芳华
作者单位:梧州桂江电力有限公司,广西梧州,543000
摘    要:溢流坝工作闸门节间及底水封漏水是许多水电厂普遍存在的难题。京南水利枢纽发电厂技术人员经过多年的分析和研究,制订了漏水处理的方案,并予以实施。实施后,取得了良好的效果,保证了大坝和闸门的安全运行,具有很强的实用价值。

关 键 词:京南水利枢纽发电厂  闸门  密封  漏水  处理
文章编号:1671-1092(2004)06-0064-02

Leakage treatment on joint and bottom seals of spillway gate of Jingnan hydropower station
CHEN Fang-hua Guijiang Electric Power Co.,Ltd. of Wuzhou City. Leakage treatment on joint and bottom seals of spillway gate of Jingnan hydropower station[J]. Large Dam & Safety, 2004, 0(6): 64-65,68
Authors:CHEN Fang-hua Guijiang Electric Power Co.  Ltd. of Wuzhou City
Abstract:Water leakage through joint seal and bottom seal of spillway gate has always been a problem for many hydropower stations. The schemes for leakage have been studied successively and performed, which achieved a good effect that ensured the dam and the gate in safe operation. The schemes are of great practice.
Keywords:Jingnan hydropower station   gate   seal   leakage   treatment