回龙水电站厂房基础开挖施工
引用本文:秦增平,王冰,崔兵. 回龙水电站厂房基础开挖施工[J]. 山西建筑, 2010, 36(6): 358-359
作者姓名:秦增平  王冰  崔兵
作者单位:辽宁省观音阁水库管理局,辽宁,本溪,117100
摘    要:对回龙水电站厂房基础开挖施工方案选择、土石方开挖施工、排降水措施、质量控制措施、工程安全、存在问题等方面进行了总结,以便总结经验,进一步提高施工管理水平。

关 键 词:水电站  厂房基础  开挖  施工

On excavation construction for plant foundation in Huilong hydropower plant
QIN Zeng-ping,WANG Bing,CUI Bing. On excavation construction for plant foundation in Huilong hydropower plant[J]. Shanxi Architecture, 2010, 36(6): 358-359
Authors:QIN Zeng-ping  WANG Bing  CUI Bing
Affiliation:QIN Zeng-ping WANG Bing CUI Bing
Abstract:The paper sums up the selection for the excavation construction,the excavation construction of cubic meter of earth and stone,the measures for drainage,the quality control methods,the project security,and some problems in excavation construction for plant foundation in Huilong hydropower plant,so as to sum up experience and to improve the management level.
Keywords:hydropower plant  plant foundation  excavation  construction  