首页 | 本学科首页   官方微博 | 高级检索  
     

利用AR模型解决全相位技术数据长度限制
引用本文:高向宇,李杨龙.利用AR模型解决全相位技术数据长度限制[J].浙江大学学报(自然科学版 ),2021,55(6):1108-1117.
作者姓名:高向宇  李杨龙
作者单位:北京工业大学 城市与工程安全减灾教育部重点实验室,北京 100124
基金项目:北京市自然科学基金资助项目(8141001)
摘    要:针对在建筑结构领域全相位技术中对数据长度的限制问题,提出使用基于自回归(AR)模型的数据外推方法(AREX),给出适用于全相位技术的AR模型定阶算法. 提出以有效频段最大能量集中为原则确定AR模型阶数的算法(ECC),与最终预测误差(FPE)、阿凯克信息准则(AIC)、贝叶斯信息准则(BIC)及奇异值差分谱准则(SVD)进行对比. 结果表明,ECC算法更适合AREX方法. 将原始信号及AREX方法与常见数据扩展方法的估计信号进行全相位处理,结果表明,AREX估计信号的波形和频谱的相似程度均优于其余方法. 将AREX方法用于建筑结构有限元分析数据和振动台试验信号的全相位数据处理,结果表明,AREX估计信号基本上可以等效原始信号结果,表明AREX可以解决全相位数据长度的限制问题.

关 键 词:全相位技术  数据扩展  自回归模型  定阶准则  频率分析  

Solving data length limit of all-phase technology by AR model
Xiang-yu GAO,Yang-long LI.Solving data length limit of all-phase technology by AR model[J].Journal of Zhejiang University(Engineering Science),2021,55(6):1108-1117.
Authors:Xiang-yu GAO  Yang-long LI
Abstract:A data extrapolation method (AREX) based on autoregressive (AR) model was proposed aiming at the limitation of data length in all-phase technology in the field of building structure. An algorithm for determining the order of AR model suitable for all-phase technology was given. An algorithm based on the principle of energy concentration criterion (ECC) was proposed to determine the order of AR model . The algorithm was compared with the final prediction error (FPE), Akaike's information criterion (AIC), Bayesian information criterion (BIC) and difference spectrum theory of singular value (SVD). Results showed that ECC algorithm was more suitable for AREX method. The original signal and the estimation signal by AREX method and the other expansion method were processed in all-phase technology. Results showed that the similarity of the waveform and spectrum of the AREX estimated signal was better than that of other methods. AREX was applied to the all-phase data processing of actual finite element and shaking table test signals in the field of building structure. Results show that the AREX estimation signal can basically be equivalent to results of the original signal, indicating that AREX can solve the limitation of all-phase data length.
Keywords:all-phase technology  data expansion  autoregressive model  order determination  frequency analysis  
点击此处可从《浙江大学学报(自然科学版 )》浏览原始摘要信息
点击此处可从《浙江大学学报(自然科学版 )》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号