首页 | 本学科首页   官方微博 | 高级检索  
     

�ܶ����ѷ��Ծ�©�����ˮ���©�γɻ콬��ԭ�������Ԥ����ʩ
引用本文:伍贤柱,谭兵. �ܶ����ѷ��Ծ�©�����ˮ���©�γɻ콬��ԭ�������Ԥ����ʩ[J]. 天然气工业, 2003, 23(2): 43-45
作者姓名:伍贤柱  谭兵
作者单位:??????????????????
摘    要:川涂地区碳酸盐岩地层,由于强烈的地质运动和地下水的溶蚀作用,存在着许多裂缝和溶洞。在钻井过程中,常因钻遇裂缝和溶洞而发生恶性井漏失返,此时井内有一定动、静液面但不在井口。针对这种恶性井漏,常采用水泥或水泥混合其它材料堵漏。在注水泥堵漏施工作业中,由于水泥浆与钻井液密度值相差较大等多种原因,往往形成较多的混浆,影响水泥胶结质量,甚至难以形成有效的水泥塞,致使水泥堵漏失败。章在水泥堵漏施工工艺方面对开成混浆的原因进行了定量的分析,提出了确定合理的堵漏钻具下入深度、控制水泥浆密度、注前置高密度钻井液等减少水泥混浆的预防措施。

关 键 词:溶洞--裂缝性 井漏 油气井 水泥堵漏 混浆 预防措施
修稿时间:2002-11-06

Reasons for Generating Mixed Slurry Owing to Loss Circulation Control by Cementing in Solution Cavityfractured Formation and Some Preventive Measures
Wu Xianzhu and Tanbing. Reasons for Generating Mixed Slurry Owing to Loss Circulation Control by Cementing in Solution Cavityfractured Formation and Some Preventive Measures[J]. Natural Gas Industry, 2003, 23(2): 43-45
Authors:Wu Xianzhu and Tanbing
Affiliation:Engineering Department of SPA
Abstract:There are a great number of fratures and solution cavities in carbonate formations in Sichuan Chongqing region because of strong crustal movements and underground water erosion.A vicious loss circulation always occurred because of drilling into fractures and solution cavities and the producing fluid and static liquid levels were often found in the well and below the wellhead.In consideration of such a vicious loss circulation,the cement or the cement mixed with the other materials was commonly adopted for controlling the loss circulation.In the work of loss circulation control by cementing,much mixed slurry is often formed owing to many reasons as a larger density difference between the slurry and the drilling fluid,which influences cement bond quality.Sometime it was even difficult to form an effective cementing plug,thus making a failure in the loss circulation control by cementing.Finally,the reasons for generating mixed slurry in actural operation are quantitatively analyzed and some preventive measures of reducing the slurry's being mixed by drilling fluid,as a reasonable drill string running in depth,controlling slurry density and injecting preflush high density drilling fluid,etc.,are proposed in the paper.
Keywords:Lost circulation  Loss circulation control by cementing  Mixed slurry  Measure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号