首页 | 本学科首页   官方微博 | 高级检索  
     

暗挖过街通道超前大管棚施工
引用本文:裴保国. 暗挖过街通道超前大管棚施工[J]. 山西建筑, 2006, 32(8): 327-327,332
作者姓名:裴保国
作者单位:中铁十二局集团有限公司第二工程公司,山西太原030032
摘    要:以深圳红岭地下通道暗挖通道B管棚施工实例,介绍了大管棚的施工流程及工艺,并结合计算机三维技术解决了小半径曲线隧道管棚设计偏角问题。

关 键 词:地下通道 小半径曲线 大管棚 三维技术
文章编号:1009-6825(2006)08-0327-02
收稿时间:2005-10-27
修稿时间:2005-10-27

Construction of lead big pilot pipes for trending underground passageway
PEI Bao-guo. Construction of lead big pilot pipes for trending underground passageway[J]. Shanxi Architecture, 2006, 32(8): 327-327,332
Authors:PEI Bao-guo
Abstract:Through a practical engineering of B-pilot pipes construction for trending underground passageway in Hongling, Shenzhen, this pa per introduces technological process of big pilot pipes construction. Combined with three-dimensional technique by computer, this paper .solves the problem of deflective angle in the design of it for carved tunnel with small radius curved line.
Keywords:underground passageway   small radius curved line   big pilot pipes   three-dimensional technique
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号