冷冻法在星云湖出流改道隧洞工程中的应用
引用本文:李俊. 冷冻法在星云湖出流改道隧洞工程中的应用[J]. 人民珠江, 2009, 0(1): 34-36
作者姓名:李俊
作者单位:广东省水利电力勘测设计研究院,广东,广州,510610
摘    要:云南星云湖出流改道隧洞工程的桩号11+000~11+120段为粉砂质黏土夹粉细砂地层。此处施工,多次涌水涌砂,不能成洞。后采用冷冻法固结土体,隧洞因此得以顺利贯通。冷冻法固结土体虽然昂贵,但有效、可靠,局部使用的话还是可以承受的。

关 键 词:隧洞施工  出流改道  涌沙  固结土体  冷冻法

Application of Freezing Method to Outflow Rerouting Tunnel Construction Project in Xingyun Lake
LI Jun. Application of Freezing Method to Outflow Rerouting Tunnel Construction Project in Xingyun Lake[J]. Pearl River, 2009, 0(1): 34-36
Authors:LI Jun
Affiliation:LI Jun ( Guangdong Provincial Investigation, Design and Research Institute of Water Conservancy and Electric Power, Guangzhou, 510611)
Abstract:The section between Pile No. 11 + 000 - 11 + 120 in the Xingyunhu Lake outflow rerouting construction is the mixture layer of silty clay and fine silt. The quick inflow of sand and water occurred several times and disabled the formation of the tunnel. The freezing method was used to consolidate the soil body and enabled the opening of the tunnel. The freezing method was proved to be effective and feasible. Thought it is somewhat expensive, it is worthwhile and affordable if used in part of the construction.
Keywords:tunnel construction  outflow rerouting  quick inflow of sand  consolidated soil  freezing method