首页 | 本学科首页   官方微博 | 高级检索  
     

81m高空现浇混凝土箱形屋盖施工技术
引用本文:梁新向,郏鸿秋.81m高空现浇混凝土箱形屋盖施工技术[J].建筑技术,1996,23(8):518-521.
作者姓名:梁新向  郏鸿秋
作者单位:中国建筑第八工程局
摘    要:介绍一座大型现浇混凝土箱形屋盖的施工经验。该屋盖位于81m高空,跨度26.8m,层高7.8m,重723t,现浇混凝土300余m^3。施工又值冬期。通过精心设计和组织提出高空支模方案和混凝土冬期施工措施,保证了工程质量和进度,取得良好效果。

关 键 词:箱形屋盖  混凝土施工  支撑  严寒气候

Construction Technology for a Cast-in-place Concrete Box-type Roof at 81m Work High Above the Ground
liang Xinxiang, Jia Hongqiu, Pu Xinrong, Chang Junfeng ,Tang Jiuru.Construction Technology for a Cast-in-place Concrete Box-type Roof at 81m Work High Above the Ground[J].Architecture Technology,1996,23(8):518-521.
Authors:liang Xinxiang  Jia Hongqiu  Pu Xinrong  Chang Junfeng  Tang Jiuru
Affiliation:liang Xinxiang; Jia Hongqiu; Pu Xinrong; Chang Junfeng ;Tang Jiuru
Abstract:In this article, the experience of construction of cast-in-place concrete box-typeroof has been introduced concisely. This roof is located at 81m high altitude, with 26. 8in in span,723 t in weight, over 300 m3 cast-in-place concrete in volume. and constructed in winter. Nev erthless. it has been undergone meticulous design and construction, particularly with a good planof high altitude scaffolding work and a well organized winter construction method and as a result,completed with high efficiency and proved of fine quality.
Keywords:cast-in-place concrete box-type roof support winter construction
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号