首页 | 本学科首页   官方微博 | 高级检索  
     

海滩围垦工程施工局部冲刷问题分析
引用本文:刘林松. 海滩围垦工程施工局部冲刷问题分析[J]. 浙江水利水电专科学校学报, 2008, 20(4): 71-74
作者姓名:刘林松
作者单位:台州市水利局,浙江,台州,318000
摘    要:沿海地区海滩围垦工程围区在施工过程中随着潮水涨落,围区内外会产生较大的水头差和围涂区域引起冲刷.施工工序安排的不合理所形成的围区内某些区段低高程段过窄是造成影响冲刷的主要原因,对围区施工过程、围区潮汐和冲刷流速计算和围区冲刷机理的分析发现,对施工区域的合理分段、制定和调整施工工序可以有效减少海涂冲刷.

关 键 词:海滩围垦  局部冲刷  施工工序  问题分析

Analysis on Partial Scouring of Polder Construction
LIU Lin-song. Analysis on Partial Scouring of Polder Construction[J]. Journal of Zhejiang Water Conservancy and Hydropower College, 2008, 20(4): 71-74
Authors:LIU Lin-song
Affiliation:LIU Lin-song (Taizhou Water Conservancy Bureau, Taizhou 318000, China)
Abstract:Tidal bore and fall in coastal areas result in severe head difference in polder construction and scouring in polder area.Being excessively low in low-elevation block resulted from unreasonable working procedure is the main reason for scouring effect.Some countermeasures are suggested on how to prevent beach scouring effectively,including reasonable block of the constructing areas and flexible adjustment of working procedure based on the analysis of scouring speed,scouring mechanism and tidal bore and fall in polder area.
Keywords:polder  partial scouring  constructing procedure  analysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号