首页 | 本学科首页   官方微博 | 高级检索  
     

大跨径预应力混凝土连续箱梁桥施工线形控制
引用本文:谢鹏. 大跨径预应力混凝土连续箱梁桥施工线形控制[J]. 山西建筑, 2010, 36(6): 323-324
作者姓名:谢鹏
作者单位:邵阳市公路桥梁建设有限责任公司,湖南,邵阳,422000
摘    要:结合肇庆大桥挂篮悬浇施工的经验,介绍了施工控制的目的、原理、测试内容及流程,具体阐述了施工控制方法、注意事项,从而将梁段标高与理论值偏差控制在允许范围内,以确保桥梁施工质量。

关 键 词:连续箱梁桥  线形  控制方法  注意事项

On linear control of construction for large-span precasting concrete continuous girder bridge
XIE Peng. On linear control of construction for large-span precasting concrete continuous girder bridge[J]. Shanxi Architecture, 2010, 36(6): 323-324
Authors:XIE Peng
Abstract:By combining with the experience of hanging basket's suspending casting construction on Zhaoqing Bridge,the paper introduces the purpose,the principle,the test contents and process of the construction control, and indicates the construction controlling methods and precautions,so as to control the bias between the height of the beam section and the theoretical value,so as to ensure the construction quality of the bridge.
Keywords:continuous girder bridge  linear  controlling methods  precautions  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号