连续梁顶推、落梁工艺及质量控制 |
| |
引用本文: | 邓娟. 连续梁顶推、落梁工艺及质量控制[J]. 重庆建筑, 2013, 0(12): 47-49 |
| |
作者姓名: | 邓娟 |
| |
作者单位: | 重庆建工桥梁工程有限责任公司,重庆400060 |
| |
摘 要: | 针对重庆某大桥副跨为50×5+36m顶推连续梁,其箱梁断面为单箱三室,分上下游各单室预制的特点,介绍连续梁顶推、落梁施工工艺和质量控制。
|
关 键 词: | 连续梁 顶推 落梁 质量控制 |
Technology of Incremental Launching and Girder Falling and Quality Control of Continuous Beam |
| |
Abstract: | Based on a bridge with side span of incremental launching continuous beam of 50×5+36m and the box girder section of three single boxes, the technology of incremental launching and girder falling and quality control of continuous beam are introduced in accordance with the prefabricated features of each single box in the upstream and downstream. |
| |
Keywords: | continuous beam incremental launching girder falling quality control |
本文献已被 维普 等数据库收录! |