建设工程变更索赔实施策略
引用本文:张力.建设工程变更索赔实施策略[J].建筑技术,2012,43(10):947-948.
作者姓名:张力
作者单位:中交第四公路工程局有限公司,100123,北京
摘    要:工程变更及索赔牵涉到工程项目的盈亏,通过对工程变更及索赔的形成原因进行分析,对常见的变更索赔情况及实施办法给以说明,并列举了变更索赔的实施实例。同时结合实际情况,提出了一些工程变更索赔的实施策略。

关 键 词:建设工程  变更  索赔  实施策略

IMPLEMENTATION STRATEGY FOR ALTERATION AND CLAIM OF CONSTRUCTION WORK
ZHANG Li.IMPLEMENTATION STRATEGY FOR ALTERATION AND CLAIM OF CONSTRUCTION WORK[J].Architecture Technology,2012,43(10):947-948.
Authors:ZHANG Li
Affiliation:ZHANG Li (CCCC Fourth Highway Engineering Co.,Ltd., 100123, Beijing, China)
Abstract:Engineering alteration and claim involve the benefit of a project. Reasons for engineering alteration and claim are analyzed and concrete practices are given to explain common alteration, claim and implementation method. Meanwhile, some implementation strategies for engineering alteration and claim are put forward according to practical conditions.
Keywords:construction work  alteration  claim  implementation strategy