Interaction between pile foundation and soil |
| |
Authors: | Z G Ter-Martirosyan Din’ Kwang Nam Nguen Zang Nam |
| |
Affiliation: | (1) Moscow State Civil-Engineering University, Russia |
| |
Abstract: | Problems of interaction between a single long pile (more than 20 m) or a group of long piles as component parts of a pile
foundation and soil are discussed on the basis of a new geomechanical model. The settlement of a pile or group of piles is
caused primarily by shear deformations of a soil mass of limited area and depth, and also as a result of deformations of the
mass beneath the lower ends of the piles.
__________
Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 2, pp. 2–7, March–April, 2007. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |
|