黄河特大桥主墩承台井点降水施工
引用本文:张恒.黄河特大桥主墩承台井点降水施工[J].城市建筑,2013(14):249-250.
作者姓名:张恒
作者单位:中交集团路桥华南工程有限公司
摘    要:包头至树林召高速公路黄河大桥主桥为85+6×150+85m的预应力连续箱梁,7个主墩,除22#、23#墩位于黄河主河槽,20#、21#、24#、25#、26#墩承台位于黄河滩地。由于黄河水位较高,采用轻型井点降水配合管井降水,进行干处基坑开挖施工。

关 键 词:井点降水  基坑开挖  承台

The Yellow River Bridge Main Pier Well Point Dewatering Construction
Zhang Heng.The Yellow River Bridge Main Pier Well Point Dewatering Construction[J].Urbanism and Architecture,2013(14):249-250.
Authors:Zhang Heng
Abstract:The Yellow River Bridge on Baotou to Shulinzhao highway is made by prestressed concrete continuous box girder of 85+6 * 150+85m, 7 main piers, except 22#, 23# pier is l- ocated in the main channel of the Yellow River, 20#, 21#, 24#, 25#, 26# pier is located in the Yellow River beach. Becau- se of the level of the Yellow River water is higher, take the me- thod of light well point precipitation and dewatering, to carry on the excavation of foundation pit on dry place.
Keywords:wel point dewatering  foundation pit excavatio-n  pile cap