首页 | 本学科首页   官方微博 | 高级检索  
     


IEEE/PSRC working group report on considerations in settinginstantaneous overcurrent relays on transmission lines
Abstract:Setting instantaneous overcurrent (IOC) relays on subtransmission lines has not been considered a complicated procedure by most utilities. However, undesirable operations have drawn attention to their intended function and application. This report addresses the causes for erroneous instantaneous overcurrent relay settings to help protection personnel avoid future undesirable operations
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号