Abstract: | Developmental projects are dynamic in the manner in which proponents react to issues or events arising during the conceptual planning, design or construction phases. The basic challenge of integrating environmental impact assessment (EIA) into an existing environmental management system (EMS) is to provide adequate control while allowing flexibility to cope with site-specific project requirements. Environmental management plans (EMP) are one way of controlling the environmental effects of construction projects. These contain project-specific protocols that act as an EMS interface between the EIA and subsequent project planning and development phases. This paper developed from the EIA follow-up session of IAIA 2001 in Cartagena, Columbia outlines the framework for an EMP and its application in respect of the development of an electrical infrastructure project within the UK. |