首页 | 本学科首页   官方微博 | 高级检索  
     


The Øresund Tunnel — Making a success of design and build
Authors:Chris Marshall
Abstract:This paper explores the benefits of design and build as procurement method for major infrastructure projects. The discussion is developed by considering the case of the Øresund Tunnel, part of the Øresund Link between Denmark and Sweden. Several examples are described of how design and build permitted innovations—in construction method and in permanent works design—which would not have arisen if design and construction had been procured separately. The paper demonstrates that in the right circumstances, design and build can lead to lower cost, faster construction, reduced risk and improved build quality.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号