莱钢3200m^3高炉计划休风恢复操作生产实践
引用本文:邱国兴,董征科. 莱钢3200m^3高炉计划休风恢复操作生产实践[J]. 南方钢铁, 2012, 0(5): 41-44
作者姓名:邱国兴  董征科
作者单位:莱芜钢铁集团银山型钢炼铁厂,山东莱芜271104
摘    要:根据生产的安排,莱钢3号3200m^3高炉进行了近16h的休风检修工作,通过优化休复风方案,合理控制各项操作参数,复风8h后快速恢复到正常生产水平,取得良好效果.

关 键 词:大型高炉  检修  复风

Reblowig of the 3200m^3 BF of LaiSteel after a scheduled blowing down
QIU Guo-xing,DONG Zheng-ke. Reblowig of the 3200m^3 BF of LaiSteel after a scheduled blowing down[J]. , 2012, 0(5): 41-44
Authors:QIU Guo-xing  DONG Zheng-ke
Affiliation:(Ironmaking plant of Laiwu Iron and Steel Group Corporation, Laiwu 271104, Shandong)
Abstract:According to the production schedule, a blowing-down for 16 hours was carried out at the 3200m^3 BF of LaiSteel. By optimizing the blowing-down and re-blowing operations and properly controlling the operating variables, it took only 8 hours after the re-blowing to return the production to its normal levels. Good benefits were attained.
Keywords:blast furnace(BF)  planned blowing down  re-blowing