首页 | 本学科首页   官方微博 | 高级检索  
     


Results of reliability test program on light water reactor piping
Authors:K. Shibata   T. Isozaki   S. Ueda   R. Kurihara   K. Onizawa  A. Kohsaka
Abstract:The Japan Atomic Energy Research Institute has conducted a piping reliability test program to demonstrate the safety and reliability of light water reactor primary piping. In this program, pipe fatigue test, leak-before-break (LBB) verification test and pipe rupture test were carried out to examine the integrity of piping, to verify the LBB and to demonstrate the effectiveness of protective measures against jet impingement and pipe whip loads under a pipe rupture event.In the pipe fatigue test, a procedure to predict the fatigue crack growth was developed, and the integrity of piping during the plant service life was evaluated. In the LBB verification test, the pipe fracture test and the leak rate test were performed to verify the LBB in the primary piping.In the pipe rupture test, the influence of jet impingement on the target disk and the deformation behavior of whipping pipe and restraint were investigated. Using the test results, the jet impingement behavior and the effectiveness of pipe whip restraint were demonstrated.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号