WWER-1000 shutdown probabilistic risk assessment: An introductory insight |
| |
Authors: | S Mohammad Hadi Hadavi |
| |
Affiliation: | Department of Nuclear Engineering, School of Engineering, Shiraz University, Shiraz, Iran |
| |
Abstract: | The probabilistic risk assessment has become an essential part of every plant’s safety/risk analysis. In the past, regulations and safety assessments of nuclear power plants were traditionally concentrated on full power operation. However, because of the events that might potentially occur during low power and shutdown modes, the assessment of risk at these operational modes is now gaining more importance. |
| |
Keywords: | |
本文献已被 ScienceDirect 等数据库收录! |
|