引用本文:程涛. 韶钢5号高炉无料钟炉顶设备安装施工技术[J]. 南方金属, 2002, 0(4): 28-30
作者姓名:程涛
作者单位:广东韶钢建设有限公司,广东,曲江,512123
摘    要:阐述了韶钢5号高炉工程首次采用的无料钟炉顶设备的特点、施工程序、安装技术等.本次设备安装采用自下而上的顺装方法,总体吊装次数减少,施工场地占用少,对炉顶大法兰焊接、各部件安装等均有施工技术保证每道工序质量,仅用了7d时间安装完毕,并且一次试车成功.

关 键 词:无料钟炉顶设备 炉顶法兰焊接 传动齿轮箱 料罐
文章编号:1009-9700(2002)04-0028-03
修稿时间:2002-05-16

Installation of the bell-less top unit for No.5 BF at Shaoguan Iron and Steel Group Co, Ltd.
CHENG Tao. Installation of the bell-less top unit for No.5 BF at Shaoguan Iron and Steel Group Co, Ltd.[J]. Southern Metals, 2002, 0(4): 28-30
Authors:CHENG Tao
Abstract:The features of the bell-less top unit for No. 5 BF at Shaoguan Iron and Steel Group(SISG) Co. , Ltd. are described, and the procedure and technique used for installing it are presented in the present discussion. A bottom-to-top installation sequence is employed, so that the equipment-lifting times and the construction site area required are considerably decreased. The quality of welding the top flange and installing the components of the top unit is ensured by strictly following the relevant installation procedures and standards. It took only 7 days to complete the installation, and the unit was successfully put into operation after only one test running.
Keywords:bell-less top equipment  welding of the top flange  transmission gearbox  material hopper