首页 | 本学科首页   官方微博 | 高级检索  
     

重力有压输水系统主线调节阀关闭水锤计算
引用本文:高婧宇,车威.重力有压输水系统主线调节阀关闭水锤计算[J].阀门,2012(1):29-32.
作者姓名:高婧宇  车威
作者单位:中国核电工程有限公司,北京100840
摘    要:在对关阀水锤的机理进行研究的基础上,应用MATLAB高级计算语言平台,对重力有压流管道部分阀门瞬时关闭情况下不同的水锤工况进行了瞬变流计算。

关 键 词:调节阀  水锤  输水主线  MATLAB

Water hammer calculation on the main regular valve-closed condition in gravity pressure water conveyance system
GAO Jing-yu,CHE Wei.Water hammer calculation on the main regular valve-closed condition in gravity pressure water conveyance system[J].Valve,2012(1):29-32.
Authors:GAO Jing-yu  CHE Wei
Affiliation:(China Nuclear Power Engineering Co. Ltd,Beijing 100840, China)
Abstract:Based on the research on the principle of valve-closed water hammer, with the application of MATLAB programming language platform, the water hammer process at different valve closing operating conditions within the pipe system has been calculated.
Keywords:water hammer  main regular valve  MATLAB
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号