首页 | 本学科首页   官方微博 | 高级检索  
     

谢叠大桥9号墩桩基和盖梁加固设计与施工监控
引用本文:肖硕刚,方填三,陈俊卿. 谢叠大桥9号墩桩基和盖梁加固设计与施工监控[J]. 有色冶金设计与研究, 2003, 24(3): 18-20
作者姓名:肖硕刚  方填三  陈俊卿
作者单位:南昌有色冶金设计研究院,南昌,330002
摘    要:介绍桩基主动托换加固和盖梁加固的主要设计构思、施工工艺流程及施工监控的主要内容。

关 键 词:板梁桥 桩基裂缝 主动加固 托换顶升 施工监控 谢叠大桥
文章编号:1004-4345(2003)03-0018-03
修稿时间:2003-07-11

Strengthening Design and Construction Monitoring of The Pile Foundation and Pier Coping of No.9 Pier of Xiedie Bridge
Xiao Shuogang Fang Tiansan Chen Junqing. Strengthening Design and Construction Monitoring of The Pile Foundation and Pier Coping of No.9 Pier of Xiedie Bridge[J]. , 2003, 24(3): 18-20
Authors:Xiao Shuogang Fang Tiansan Chen Junqing
Abstract:This article introduces the design considerations for pile foundation reinforcement by active underpinning and pier coping reinforcement, and the corresponding construction technological flow and construction monitoring.
Keywords:pile foundation   crack   active strengthening   underpinning   lift-up   construction monitoring
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号