承包商如何做好工程变更
引用本文:周虹君,黄有亮.承包商如何做好工程变更[J].工厂建设与设计,2008(2):105-107.
作者姓名:周虹君  黄有亮
作者单位:东南大学建设与房地产系,南京210096
摘    要:由于工程项目自身的特点、自然环境和地质环境的复杂性以及勘察设计工作者在设计过程中不可能预计到施工期间的突发情况,这些就使得工程建设过程中不可避免地发生工程变更。承包商在投标报价时以及工程实施过程中要能够合理地运用工程变更策略,尽量不以索赔而以签证的方式处理问题,这既有利于承包商得到期望中的利益,又有利于业主和承包商创建一个友好和谐的合作氛围,使工程顺利完成。

关 键 词:工程变更  承包商  索赔  签证
文章编号:1007-9467(2008)02-0105-03
收稿时间:2007-10-12

How to Deal with Project Change by Contractor
Authors:ZHOU Hong-jun  HUANG You-liang
Abstract:characteristic of engineering itself, complexity of entironment and geologic circumstance, and that in design process reconnaissance designer cannot forecast all possible instances of construction period, all of these can result in project change inevitably for building engineering. Because of this, contractor shall exert the strategy of project change when bid and implement, and use visa method not claim to deal with it to the best of his abilities. Just do this ,can benefit contractor, set up harmonious cooperate atmosphere, and make engineering accomplished successfully.
Keywords:project change  contractor  claim  visa