南水北调中线一期工程水量调度方案制定分析
引用本文:张忠波,张双虎,蒋云钟. 南水北调中线一期工程水量调度方案制定分析[J]. 南水北调与水利科技(中英文), 2011, 9(6): 5-10
作者姓名:张忠波  张双虎  蒋云钟
作者单位:1. 天津大学建筑工程学院,天津,300072
2. 中国水利水电科学研究院,北京,100038
基金项目:水利部公益性行业科研专项经费项目(200801005)
摘    要:在南水北调中线一期工程建成后,调度方案是执行水量调度主要指导方向.主要从时间尺度和工程对应区域的角度来制定调度方案.时间尺度主要有非汛期与汛期、月和旬;工程对应区域包括水源区和受水区.从汛期与非汛期的时间尺度的角度,分析了水源区调水前提条件和受水区的需水计划,在对应的时间尺度中根据调度方案制定执行计划.并从月与旬的时间尺度制定对应的调度方案,丰富了调度工程实时调度方案.结合不同的时间尺度中不同区域的不同调度要求,在年终调度计划总结时,进行滚动修正,作为下一年调度方案制定的前提,权衡了各受水区权益.遵循合理的调度原则,保证各受水区的权益,为南水北调中线一期工程后期管理工作奠定了基础.

关 键 词:南水北调中线工程  一期工程  水量调度  调度方案  汛期  非汛期  时间尺度

The Analysis of Working out the First Stage of the Middle Route South-to-North Water Diversion Project Scheduling Schemes
ZHANG Zhong-bo , ZHANG Shuang-hu , JIANG Yun-zhong. The Analysis of Working out the First Stage of the Middle Route South-to-North Water Diversion Project Scheduling Schemes[J]. South-to-North Water Transfers and Water Science & Technology, 2011, 9(6): 5-10
Authors:ZHANG Zhong-bo    ZHANG Shuang-hu    JIANG Yun-zhong
Affiliation:ZHANG Zhong-bo1,ZHANG Shuang-hu2,JIANG Yun-zhong2(1.School of Architecture Engineering,Tianjin University,Tianjin 300072,China,2.China Institute of Water Resources and Hydropower Research,Beijing 100038,China)
Abstract:Operational schemes are main directions for executing water scheduling,after building the Middle Route South-to-North Water Transfer Project,which were established by time and region corresponding to the project.Time scales were flood season and non-flood season,month and a period of ten days,and project regions were water resource regions and receiving water regions.By analyzing the precondition of water resource regions and require of receiving water regions,the plan was developed by the operational schem...
Keywords:Middle Route South-to-North Water Transfer Project  the First Phase  water scheduling scheme  operation plan  flood season  non-flood season  time scale  