首页 | 本学科首页   官方微博 | 高级检索  
     


Nominees as Candidates for the Executive Board 1989–1991
Authors:Dennis G Miller  Charles E Shirley  John W Chenoweth
Affiliation:1. M.IWRA, Department of Civil Engineering , University of Manitoba , WINNIPEG, MB, R3T 2N2, CANADA;2. Department of Public Works , SOLO , Central Java, INDONESIA
Abstract:ABSTRACT

Principles of sustainable development are inviting a change in the approach used for reservoir management. Instead of designing and planning new reservoirs, more emphasis will be placed on management of existing reservoirs. Reservoir storage reallocation and reassessment of reservoir operational rules are considered to be the two main problems to be addressed by reservoir research in the near future. Appropriate techniques for solving these two problems are necessary An attempt at developing a sound methodology for a reservoir reassessment has been presented here. A simulation approach, based on the four probability criteria, has been used in this context for storage analysis. Reservoir management strategies have been reassessed using an implicit stochastic optimization model. The methodology has been applied to Wonogiri Reservoir located in Central Java, Indonesia. Analysis of the storage capacity indicated that the current capacity is larger than that required for the irrigation of an area of 25,319 ha, corresponding to the Wonogiri reservoir final development phase. Thus, the present size of the reservoir allows for additional multipurpose use of the reservoir storage. Optimization of the reservoir yield demonstrated that the reservoir can provide for municipal and industrial water supply and hydropower generation in addition to the current use af reservoir storage for irrigation water supply.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号