摘    要:桐子林水电站导流明渠围堰采用高喷灌浆和控制性灌浆相结合的防渗方案,高喷防渗最大孔深达52 m,且要在架空严重的大块石层中成孔,质量控制难度很大.桐子林水电站围堰高喷防渗墙施工完毕后,经过墙体开挖、围井抽水、钻孔取芯等质量检查以及注水试验结果表明,其施工方案、方法、工艺是正确的,可供其他工程借鉴.

关 键 词:围堰  防渗  高压旋喷灌浆  施工技术  质量控制  桐子林水电站

High-pressure Jet Grouting for Seepage Control in Tongzilin Hydropower Station
Zou Gang.High-pressure Jet Grouting for Seepage Control in Tongzilin Hydropower Station[J].Water Power,2011,37(9):55-57,64.
Authors:Zou Gang
Affiliation:Zou Gang(Sinohydro Bureau 7 Chengdu Hydropower Construction Engineering Co.,Ltd.,Wenjiang 611130,Sichuan,China)
Abstract:The high-pressure jet grouting and controlled grouting were used for cofferdam seepage control of diversion channel in Tongzilin Hydropower Station.The maximum depth of high-pressure jet grouting hole is 52 m and the construction quality is difficult to control.After the completion of cut-off wall,the examinations by wall excavation,surrounding wells pumping and coring and water injection tests show that the construction programs,methods and technologies are reasonable.
Keywords:cofferdam  seepage control  high-pressure jet grouting  construction technology  quality control  Tongzilin Hydropower Station  