首页 | 本学科首页   官方微博 | 高级检索  
     


A numerical method for determining the stuck point in extended reach drilling
Authors:Sun Lianzhong and Gao Deli
Affiliation:Key Laboratory of Petroleum Engineering, Ministry of Education, China University of Petroleum, Beijing 102249, China;Key Laboratory of Petroleum Engineering, Ministry of Education, China University of Petroleum, Beijing 102249, China
Abstract:A stuck drill string results in a major non-productive cost in extended reach drilling engineering. The first step is to determine the depth at which the sticking has occurred. Methods of measurement have been proved useful for determining the stuck points, but these operations take considerable time. As a result of the limitation with the current operational practices, calculation methods are still preferred to estimate the stuck point depth. Current analytical methods do not consider friction and are only valid for vertical rather than extended reach wells. The numerical method is established to take full account of down hole friction, tool joint, upset end of drill pipe, combination drill strings and tubular materials so that it is valid to determine the stuck point in extended reach wells. The pull test, torsion test and combined test of rotation and pulling can be used to determine the stuck point. The results show that down hole friction, tool joint, upset end of drill pipe, tubular sizes and materials have significant effects on the pull length and/or the twist angle of the stuck drill string.
Keywords:Extended reach drilling   stuck pipe   torque and drag   numerical method
本文献已被 CNKI 维普 SpringerLink 等数据库收录!
点击此处可从《石油科学(英文版)》浏览原始摘要信息
点击此处可从《石油科学(英文版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号