首页 | 本学科首页   官方微博 | 高级检索  
     

考虑热泵负荷和分布式光伏的配微网协调调度
引用本文:金逸,肖匀,刘庭,刘凯,肖宾. 考虑热泵负荷和分布式光伏的配微网协调调度[J]. 中国电力, 2012, 45(9): 29-34. DOI: 10.11930/j.issn.1004-9649.2012.9.29.5
作者姓名:金逸  肖匀  刘庭  刘凯  肖宾
作者单位:1. 国网河北省电力有限公司,河北 石家庄 050021;2. 清华大学 电机工程与应用电子技术系,北京 100084
基金项目:国家自然科学基金资助项目(U2066601);国网河北省电力公司科技项目(数字化主动配电网风险调度与分布式资源智能控制关键技术研究,SGHE0000DKJS2000637)
摘    要:随着农村清洁供热改造以及城镇分布式光伏建设的不断推进,配电网中出现了大量农村微电网。分布式光伏的强随机性和波动性给电网的运行调控带来了诸多挑战,电网面临剧烈的潮流波动和严重的电压越限等问题。首先,构建了计及热泵、光伏和储能的配微网分解协调模型,其中热泵用等效状态空间模型描述;然后,提出一种配微网有功无功协调优化方法,并采用改进的Benders分解算法进行求解;最后,在D141-M4算例系统上进行了算例测试。测试结果表明,所提方法可以在保证用户舒适度的前提下,有效降低电网峰值负荷,并提升电压安全水平。

关 键 词:500 kV  同塔四回线路  不全停运  感应电压  检修作业  
收稿时间:2012-06-27
修稿时间:2022-08-08

Study on Circuit Service Without Total Outage of the 500 kV Transmission Line of Four Circuits on One Tower
JIN Yi , XIAO Yun , LIU Ting , LIU Kai , XIAO Bin. Study on Circuit Service Without Total Outage of the 500 kV Transmission Line of Four Circuits on One Tower[J]. Electric Power, 2012, 45(9): 29-34. DOI: 10.11930/j.issn.1004-9649.2012.9.29.5
Authors:JIN Yi    XIAO Yun    LIU Ting    LIU Kai    XIAO Bin
Affiliation:1. State Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, China;2. Department of Electrical Engineering, Tsinghua University, Beijing 100084, China
Abstract:In order to provide a technical basis for circuit service without total outage of the 500 kV transmission line of four circuits on one tower, the induced voltage of outage circuits were calculated by simulation under the condition of two circuits operating while the other two outage, or three circuits operating while the other one outage. The calculation result indicates that when the two ends of outage circuits is ungrounded, the max peak value of the induced voltage of outage circuits can reach as high as 105 kV; when the two ends of outage circuits is grounded, the max peak value of the induced voltage of outage circuits can also reach as high as 95 V. It is proposed that, when the 500 kV four circuits on one tower is incomplete outage, the service operation can be live working, or power-off working with safety protective measures.
Keywords:500 kV  four circuits on one tower  incomplete outage  induced voltage  service operation  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号