首页 | 本学科首页   官方微博 | 高级检索  
     

GFC 数据在机电安装软件间的适用性研究
引用本文:王兴冲,王家远,李政道,喻博,周福萍.GFC 数据在机电安装软件间的适用性研究[J].工程管理学报,2018,0(4):27-031.
作者姓名:王兴冲  王家远  李政道  喻博  周福萍
作者单位:深圳大学 土木工程学院
摘    要:目前,Revit 建模软件与各机电算量软件之间的互通性问题备受行业关注。传统机电安装计量方式面临耗时、量大、过程复杂、误差较大以及 BIM 软件之间数据无法互通等问题。基于此,提出一种基于 GFC 数据交互的计量方法:经设计深化的模型,通过 GFC 数据接口,传递至安装算量软件中,进行机电安装工程计量与计价,为数据交互在机电安装工程中的应用提供新的视角。以某康复中心项目为例,运用广联达 BIM 安装算量软件开展机电安装工程数据交互适用性问题的研究,通过分析安装算量软件的构件转化率,表明 GFC 数据具有很强的适用性。依据 Revit 建模软件建立的模型和 Revit 建模软件数据交换后的模型,进行模型工程量分析,找出量差的因素并提出改进意见,从而提高成本核算过程中计量的效率,进而推动 BIM 在建设项目计量中的应用

关 键 词:数据交互  Revit  GFC  机电安装

Research on Applicability of GFC Data in MEP Software
WANG Xing-chong,WANG Jia-yuan,LI Zheng-dao,YU Bo,ZHOU Fu-ping.Research on Applicability of GFC Data in MEP Software[J].Journal of Engineering Management,2018,0(4):27-031.
Authors:WANG Xing-chong  WANG Jia-yuan  LI Zheng-dao  YU Bo  ZHOU Fu-ping
Affiliation:College of Civil Engineering,Shenzhen University
Abstract:At present,the interoperability between Revit modeling software and various MEP calculation softwares has attractedmuch attention. Traditional mechanical and electrical installation measurement methods are time-consuming,heavy-workload,complex, and errors intensive. Apart from this, the problem of data derived from different BIM software are unable to interoperate.Under this background,a measurement method based on the GFC data interaction is proposed. This paper establishes an elaboratelydesigned model which can be used in the installation calculation software through the GFC data interface. Through metrology andpricing of the mechatronic installation project,this model provides a new perspective for data exchange in MEP. Taking arehabilitation center project as an example, this paper applies Glodon BIM installation calculation software to study the applicabilityof MEP data exchange. The results show that the GFC data has a strong applicability by analyzing the component conversion rate ofinstallation calculation software. Based on the models built by Revit modeling software and the data exchanged by Revit modelingsoftware,this paper analyzes the quantity of the project and finds out the factors resulting in difference in quantity estimation. At last,this study puts forward improvement suggestions to improve the measurement efficiency in the costing process,and then promote theapplication of BIM in the construction project measurement.
Keywords:data interaction  Revit  global foundation class  MEP
本文献已被 CNKI 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号