首页 | 本学科首页   官方微博 | 高级检索  
     

云台山隧道二衬混凝土外观质量控制
引用本文:耿新文. 云台山隧道二衬混凝土外观质量控制[J]. 山西建筑, 2009, 35(23): 239-240
作者姓名:耿新文
作者单位:山西省交通建设工程监理总公司,山西太原,030006
摘    要:结合阳翼高速公路云台山隧道二衬施工中外观出现的一些质量问题,详细分析了其产生的原因并针对性地提出了改进措施,从而确保隧道二衬混凝土外观质量,同时为以后二衬施工质量控制积累经验。

关 键 词:隧道  二衬混凝土  外观质量  控制

Outward appearance quality control of second lining concrete in tunnel of Yuntai hill
GENG Xin-wen. Outward appearance quality control of second lining concrete in tunnel of Yuntai hill[J]. Shanxi Architecture, 2009, 35(23): 239-240
Authors:GENG Xin-wen
Affiliation:GENG Xin-wen
Abstract:Combining some outward appearance quality problem in second lining construction in Yuntai hill tunnel in Yang-Yi highway, the pa-per makes detailed analysis on reasons for the problems and it also proposes relative improving measures, so as to assure the outward appearance quality of second lining concrete, at the same time accumulates experiences for such kind of construction.
Keywords:tunnel  second lining concrete  outward appearance quality  control
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号