首页 | 本学科首页   官方微博 | 高级检索  
     

浅滩及急流裸露基岩钢栈桥施工技术
引用本文:施俊波. 浅滩及急流裸露基岩钢栈桥施工技术[J]. 山西建筑, 2012, 38(11): 193-195
作者姓名:施俊波
作者单位:中铁十九局集团第六工程有限公司,江苏无锡,214000
摘    要:通过对丰溪河特大桥栈桥施工,总结了其施工技术,得出浅滩、急流、裸露基岩栈桥施工的基本技术及施工工艺,并归纳了施工注意事项,以期为以后类似施工提供经验。

关 键 词:浅滩  急流  裸露基岩  栈桥  锚固

On construction technique for steel trestle at shoals,jet stream and uncovered bedrock
SHI Jun-bo. On construction technique for steel trestle at shoals,jet stream and uncovered bedrock[J]. Shanxi Architecture, 2012, 38(11): 193-195
Authors:SHI Jun-bo
Affiliation:SHI Jun-bo(No.6 Engineering Co.,Ltd,of China Railway Nineteenth Bureau Group,Wuxi 214000,China)
Abstract:According to the trestle construction of Fengxi River super Bridge,the paper sums up its construction technique,and concludes the basic technique and construction craft for the trestle construction at the shoals,the jet stream and uncovered bedrock,and sums up some construction precautions,so as to provide the experience for similar construction in future.
Keywords:shoal  jet stream  uncovered bedrock  trestle  anchorage
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号