首页 | 本学科首页   官方微博 | 高级检索  
     

山区复杂地质情况下嵌岩型人工挖孔桩施工
引用本文:王瑞卿. 山区复杂地质情况下嵌岩型人工挖孔桩施工[J]. 山西建筑, 2011, 37(15): 67-68
作者姓名:王瑞卿
作者单位:中冶天工集团有限公司中原分公司,天津,300308
摘    要:结合山区复杂地质情况下嵌岩型人工挖孔桩施工难点,采取了自制挖孔机具结合孔底定向爆破施工方法,详细论述了其施工工艺及操作要点,从而积累了类似地质条件下桩基施工经验。

关 键 词:复杂地质  人工挖孔桩  孔底定向爆破  施工

Construction of rock-socketed type manpower excavation pile under mountainous complex geology condition
WANG Rui-qing. Construction of rock-socketed type manpower excavation pile under mountainous complex geology condition[J]. Shanxi Architecture, 2011, 37(15): 67-68
Authors:WANG Rui-qing
Affiliation:WANG Rui-qing
Abstract:Combining with construction difficulties of rock-socketed type manpower excavation pile under mountainous complex geology condition,it adopts the construction method of self-manufactured excavation machines integrating with directional blasting at bottom of the hole,specifically discusses the construction technology and operation points.Thus,it has accumulated pile foundation construction experience under similar geology condition.
Keywords:complex geology  manpower excavation pile  directional blasting at bottom of the hole  construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号