首页 | 本学科首页   官方微博 | 高级检索  
     

沪昆客运专线壁板坡隧道分合修方案研究
引用本文:刘鹏. 沪昆客运专线壁板坡隧道分合修方案研究[J]. 山西建筑, 2011, 37(15): 150-152
作者姓名:刘鹏
作者单位:中铁二院工程集团有限责任公司,四川,成都,610031
摘    要:针对壁板坡隧道所面临的主要地质问题,从隧道施工风险、工期、运营维护、工程投资等方面入手,对壁板坡隧道的分合修方案进行了论证和研究,为分合修方案的决策提供了依据,对今后类似工程具有指导作用。

关 键 词:客运专线  岩溶  煤系地层  工期  风险评估

Study on wainscot slope tunnel division and reunion maintenance program on Hu-Kun passenger special line
LIU Peng. Study on wainscot slope tunnel division and reunion maintenance program on Hu-Kun passenger special line[J]. Shanxi Architecture, 2011, 37(15): 150-152
Authors:LIU Peng
Abstract:In light of main geological problems of wainscot slope tunnel,starting from aspects of tunnel construction risk,construction period,operation maintenance,and project investment and so on,it discusses and studies the wainscot slope tunnel division and reunion maintenance program,and provides basis for the decision of division and reunion program,which has certain guiding significance for future similar project.
Keywords:passenger special line  karst  coal-bearing series  construction period  risk estimation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号