首页 | 本学科首页   官方微博 | 高级检索  
     

施工期临时断面挡水渡汛对于面板坝坝坡稳定的影响研究
引用本文:郭永吉,崔自力,王志杰.施工期临时断面挡水渡汛对于面板坝坝坡稳定的影响研究[J].水资源与水工程学报,2012,23(4):51-55.
作者姓名:郭永吉  崔自力  王志杰
作者单位:1. 宝鸡市水利水电规划勘测设计院,陕西宝鸡,721000
2. 陕西水环境工程勘测设计研究院,陕西西安,710018
3. 西安理工大学水利水电学院,陕西西安,710048
基金项目:国家自然科学基金项目(50779051)
摘    要:面板堆石坝施工期采用临时断面挡水度汛方案时,由于临时断面上游尚未施工混凝土面板,因此临时断面的大部分区域及坝基材料将处于饱和状态,这种状态有可能对大坝竣工期的坝坡稳定产生某种影响。为研究临时断面挡水度汛对于大坝竣工期坝坡稳定的影响,本文结合一工程实例,首先采用有限元法进行了临时断面挡水度汛情况下的渗流分析,然后采用非线性有限元法对临时断面是否挡水度汛两种情况下大坝竣工期的坝坡稳定性进行了比较研究。结果表明:采用临时断面挡水度汛施工方案对于大坝竣工期上游坝坡抗滑稳定的影响要大于对于下游坝坡的影响,但其影响是有限的。

关 键 词:面板堆石坝  临时断面  挡水度汛  竣工期  坝坡稳定
收稿时间:2011/12/29 0:00:00
修稿时间:2012/4/19 0:00:00

Study on the influence of temporary section of retaining dike for flood protection on the dam slope stability of CFRD during construction period
GUO Yongji,CUI Zili and WANG Zhijie.Study on the influence of temporary section of retaining dike for flood protection on the dam slope stability of CFRD during construction period[J].Journal of water resources and water engineering,2012,23(4):51-55.
Authors:GUO Yongji  CUI Zili and WANG Zhijie
Affiliation:1.Baoji Planning Survey and Design Institute of Water Resources and Hydropower,Baoji 721000,China; 2.Shaanxi Reconnaissance Design & Research Institute of Water Environmental Engineering,Xi’an 710018,China; 3.Faulty of Water Resources and Hydroulic Power,Xi’an University of Technology,Xi’an 710048,China)
Abstract:When using the temporary section of retaining dike for flood protection during the face rockfill dam construction,lacking of concrete panel construction in upstream will lead to a saturation state of most area on temporary section and dam foundation material,which would affect the stability of dam slope when the dam is completed.To study the effect of temporary section of retainins dike for flood protection on stability of CFRD,combining with the Hongjiadu concrete face rock-fill dam project,the paper analyzed the seepage under temporary section of retaining dike for flood protection by finite element method,and studied the dam slope stability in the two situations that whether temporary section retains flood or not by using nonlinear finite element method.The result showed that the impact of using temporary section for flood protection on the upstream dam slope stability against sliding will be more than the impact of that on downstream dam slope,while the impact was limited.
Keywords:CFRD  temporary cross-section  retaining dike  completion period  dam slope stability
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水资源与水工程学报》浏览原始摘要信息
点击此处可从《水资源与水工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号