延迟焦化装置扩容及节能技术改造运行分析
引用本文:顾承瑜.延迟焦化装置扩容及节能技术改造运行分析[J].石油炼制与化工,2010,41(3):6-10.
作者姓名:顾承瑜
作者单位:中国石化金陵分公司炼油运行三部,南京,210033
摘    要: 介绍了中国石化金陵分公司Ⅲ套延迟焦化装置扩容和节能改造的情况,对装置改造后的运行状况进行了标定。结果表明,改造后加工能力达到1.85 Mt/a,能耗比改造前降低了144.63 MJ/t,降幅为12.8%,扩容及节能改造实现了预期的目标。

关 键 词:延迟焦化  技术改造  经济效益
收稿时间:2009-9-18

CAPACITY EXPANSION AND ENERGY SAVING REVAMPING OF A DELAYED COKING UNIT
Gu Chengyu.CAPACITY EXPANSION AND ENERGY SAVING REVAMPING OF A DELAYED COKING UNIT[J].Petroleum Processing and Petrochemicals,2010,41(3):6-10.
Authors:Gu Chengyu
Abstract:The capacity expansion and energy saving revamping of the No.3 delayed coking unit in SINOPEC Jinling Company was introduced. Results of performance test after revamping showed that processing capacity of the unit reached 1.85 Mt/a, and the energy consumption reduced 144.62 MJ/t as compared with prior to revamping (a reduction scope of 12.8%), which well met the revamping targets.
Keywords:delayed coking  technical transform  economic effect