首页 | 本学科首页   官方微博 | 高级检索  
     

低水头闸坝式枢纽工程泥沙问题研究
引用本文:李远贤.低水头闸坝式枢纽工程泥沙问题研究[J].四川水力发电,2003,22(2):55-57,68.
作者姓名:李远贤
作者单位:四川省水利水电勘测设计研究院,水电科研所,四川,成都,610072
摘    要:低水头闸坝式枢纽工程在山区、平原中小河流上应用较多,由于有供水及引水发电的需要,需要解决首部枢纽的取水防沙、拦沙排沙及闸下游的消能防冲等泥沙问题。根据一些工程的模型试验成果,对这些问题进行总结,供设计和运行管理部门参考。

关 键 词:低水头闸坝式枢纽工程  拦沙排沙  消能防冲  泥沙  取水防沙
文章编号:1001-2184(2003)02-0055-03

Study on Sediment at Gated Dam with Low Head
LI Yuan,xian.Study on Sediment at Gated Dam with Low Head[J].Sichuan Water Power,2003,22(2):55-57,68.
Authors:LI Yuan  xian
Abstract:Hydropower project with low head and gated dam is usually located in small rivers in a mountainous area and plain . For water supply and power generation , sediment problems concerning water intake , sediment control , sediment trapping , sediment discharge at headwork and energy dissipation and anti-scour downstream must be solved . According to model test results of some projects , above mentioned problems are studied and the results are provided to designers and operators for reference .
Keywords:water intake and sediment control  sand flushing  helical flow  start velocity  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号