现浇箱梁后张法施工监理控制
引用本文:赵家双,刘小和.现浇箱梁后张法施工监理控制[J].山西建筑,2006,32(11):207-208.
作者姓名:赵家双  刘小和
作者单位:江苏交通工程咨询监理有限公司,江苏南京210004
摘    要:结合现场施工特点,从预应力筋安装、张拉控制、管道压浆三方面对预应力混凝土箱梁后张法施工控制要点进行了探讨,以提高现浇箱梁后张法施工质量,可供类似工程参考。

关 键 词:后张法  预应力  现浇箱梁  管道压浆
收稿时间:2005-12-08

Supervisory control of cast-in-situ box beam post-tensioning construction
ZHAO Jia-shuang, LIU Xiao-he.Supervisory control of cast-in-situ box beam post-tensioning construction[J].Shanxi Architecture,2006,32(11):207-208.
Authors:ZHAO Jia-shuang  LIU Xiao-he
Abstract:Combined with characteristics of site construction, the author discusses control essential of pre-stressed concrete box beam post-tensioning construction from pre-stressed bar installation, stretching control and pipeline pressure grouting, in order to improve the quality of cast-in-situ box beam post-tensioning construction, which to offer a reference for similar project.
Keywords:post-tensioning method  pre-stressing force  cast-in-situ box beam  pipeline pressure grouting