首页 | 本学科首页   官方微博 | 高级检索  
     


Heuristic algorithm for a cutting stock problem in the steel bridge construction
Authors:Yaodong Cui  Yiping Lu
Affiliation:1. Department of Computer Science, Guangxi Normal University, Guilin 541004, China;2. School of Mechanical, Electronic and Control Engineering, Beijing Jiaotong University, Beijing 100044, China
Abstract:A rectangular two-dimensional cutting stock problem in the steel bridge construction is discussed. It is the problem of cutting a set of rectangular items from plates with arbitrary sizes that lie in the supplier specified ranges, such that the necessary plate area is minimized. Several types of cutting patterns are used to compose the cutting plan. All of them are easy to generate and cut except the last one. The algorithm uses both recursive and dynamic programming techniques to generate patterns of the last type. The computational results of 22 practical instances indicate that the algorithm can produce solutions close to optimal, and the computation time is reasonable for practical use.
Keywords:Cutting stock   Two-dimensional cutting   Steel bridge construction   Steel structure
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号