首页 | 本学科首页   官方微博 | 高级检索  
     


Resource allocation with project management software
Authors:Christoph Mellentien  Norbert Trautmann
Affiliation:Institut für Wirtschaftstheorie und Operations Research, Universit?t Karlsruhe, 76128 Karlsruhe, Germany (e-mail: {mellentien,trautmann}@wior.uni-karlsruhe.de), DE
Abstract:We present results of a benchmark test evaluating the resource allocation capabilities of the project management software packages Acos Plus.1 8.2, CA SuperProject 5.0a, CS Project Professional 3.0, MS Project 2000, and Scitor Project Scheduler 8.0.1. The tests are based on 1560 instances of precedence– and resource–constrained project scheduling problems. For different complexity scenarios, we analyze the deviation of the makespan obtained by the software packages from the best feasible makespan known. Among the tested software packages, Acos Plus.1 and Project Scheduler show the best resource allocation performance. Moreover, our numerical analysis reveals a considerable performance gap between the implemented methods and state–of–the–art project scheduling algorithms, especially for large–sized problems. Thus, there is still a significant potential for improving solutions to resource allocation problems in practice.
Keywords:: Project management software –  Resource allocation –  Performance evaluation
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号