首页 | 本学科首页   官方微博 | 高级检索  
     

洞桩法施工在北京地铁中的应用
引用本文:陈俊,吴顺川. 洞桩法施工在北京地铁中的应用[J]. 山西建筑, 2007, 33(3): 272-273
作者姓名:陈俊  吴顺川
作者单位:北京科技大学土木与环境工程学院,北京,100083
摘    要:结合北京地铁十号线光华路站中洞施工实例,介绍了洞桩法的施工工艺,进一步探讨洞桩法的施工关键和施工难点,提出了相应的解决措施,为其他大跨地铁施工提供重要的参考价值。

关 键 词:地铁车站  浅埋暗挖  洞桩法
文章编号:1009-6825(2007)03-0272-02
修稿时间:2006-07-12

Application of cavern-pile method used in Beijing subway
CHEN Jun,WU Shun-chuan. Application of cavern-pile method used in Beijing subway[J]. Shanxi Architecture, 2007, 33(3): 272-273
Authors:CHEN Jun  WU Shun-chuan
Affiliation:CHEN Jun WU Shun-chuan
Abstract:Based on the construction example of Guanghua road station on the tenth line of Beijing subway,this paper introduced the construction of cavern-pile method and discussed the key techniques,main difficulties and corresponding measures of cavern-pile method.This study provides important value for the other construction of subway stations.
Keywords:subway station  shallow-embedding-deep-excavating method  cavern-pile method
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号