首页 | 本学科首页   官方微博 | 高级检索  
     


A new AMS beam line at the Erlangen tandem accelerator facility
Authors:M. Baumg  rtner, U. Emmerling, W. Ernst, E. Finckh, G. Fuchs, F. Gumbmann, M. Haller, R. H  pfl, R. Karschnick, W. Kretschmer, A. Rauscher, M. Schleicher,W. Schuster
Affiliation:

Physikalisches Institut, University of Erlangen — Nürnberg, D-8520, Erlangen, FRG

Abstract:An accelerator mass spectrometry beam line is presently being built up at the EN tandem accelerator in Erlangen. A new Cs sputter ion source is being developed, and mass separators on both the low- and high-energy sides of the tandem and an electrostatic sector field for charge-state selection have been installed. Optimization of the beam quality will be possible with a new emittance measuring device. The tandem is stabilized via a position-sensitive Faraday cup, which simultaneously measures the current of the abundant isotopes. The spectra of the rare-isotope ions are taken by differential energy loss measurements in a gas ionization chamber.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号