抽水蓄能电站施工控制网的设计与施测
引用本文:王瀛勇,刘光朝. 抽水蓄能电站施工控制网的设计与施测[J]. 大坝与安全, 2002, 0(5): 21-23
作者姓名:王瀛勇  刘光朝
作者单位:华东勘测设计研究院测绘研究分院,杭州,310030
摘    要:本文通过对桐柏、宜兴、泰安等抽水蓄能电站施工控制网的技术设计、网形优化及施测方案等方面的论述,总结了在特殊困难地区采用LeicaTCA2003全站仪和ZeissDiNi12电子水准仪建立高精度的施工控制网的经验,并通过对施测成果的精度评定,对施测方案提出合理的建议。

关 键 词:抽水蓄能电站  施工控制网  LeicaTCA2003全站仪  ZeissDiNi12电子水准仪
文章编号:1671-1092(2002)05-0021-03
修稿时间:2002-07-28

On construction network design and survey of pumped storage stations
by Wang Yingyong and Liu Guangchao//Surveying De-partment of East China Investigation and Design Institute. On construction network design and survey of pumped storage stations[J]. Large Dam & Safety, 2002, 0(5): 21-23
Authors:by Wang Yingyong and Liu Guangchao//Surveying De-partment of East China Investigation and Design Institute
Affiliation:by Wang Yingyong and Liu Guangchao//Surveying De-partment of East China Investigation and Design Institute
Abstract:Based on the practice in some pumped storage hydropower stations,this paper introduces the design of construction network and ob-servation scheme .It concludes the experience of setting up high precision construction network by using Leica TCA2003and Zeiss DiNi12.
Keywords:pumped storage station  construction network  Leica TCA2003  Zeiss DiNi 12