草街电站主厂房桥式起重机负荷试验方案设计
引用本文:夏敏静. 草街电站主厂房桥式起重机负荷试验方案设计[J]. 广东水利电力职业技术学院学报, 2011, 9(1): 12-14
作者姓名:夏敏静
作者单位:三峡电力职业学院;
摘    要:简述重庆嘉陵江草街电站主厂房桥式起重机概况,明确负荷试验的各项要求,制定试验的详细操作程序,提出试验过程中应该采取的安全措施,确定试验的组织机构及具体日程安排.

关 键 词:负荷试验  实验要求  试验程序  安全措施

Overhead Travelling Crane Load Test Program Design in Chao Jie Power Station Main Plant
XIA Min-jing. Overhead Travelling Crane Load Test Program Design in Chao Jie Power Station Main Plant[J]. Journal of Guangdong Technical College of Water Resources and Electric Engineering, 2011, 9(1): 12-14
Authors:XIA Min-jing
Affiliation:XIA Min-jing (Three Gorges Vocational School,Yichang 443000,China)
Abstract:This paper introduces the outline of overhead travelling crane in Chao Jie Power Station main plant over Jialing River in Chongqing,and clarifies the load test requirements.In addition,detailed test operational procedures are discussed while security measures during the test are proposed and organization structure and specific test schedule are decided.
Keywords:load test  test requirement  test procedures  security measure  