Chai Shitan high dam hydroelectric project is a large project being built in Yunnan province. The test results of the hydraulic model scaled 1:50 with a moving bed for the spillway on the bank of this project are briefly described in this paper. In conjunction with the engineering conditions of this project, two optimization plans of trajectory bucket-type energy dissipator are suggested.