上汽300MW机组高中压缸启动差胀分析
引用本文:许涛,李阳海,梅海龙.上汽300MW机组高中压缸启动差胀分析[J].湖北电力,2010,34(6):34-36.
作者姓名:许涛  李阳海  梅海龙
作者单位:[1]湖北省电力试验研究院,湖北武汉430077 [2]湖北汉新发电有限公司,湖北汉川431614
摘    要:介绍了某电厂上汽300 MW机组高中压缸启动过程,对机组启动过程中各时段的差胀问题进行了介绍及理论分析,为上汽300 MW机组机组高中压缸启动提供了参考。

关 键 词:300MW机组  高中压缸  差胀

The Different Expansion Analysis of HP and IP Cylinders in 300 MW Unit from Shanghai Turbine Company
XU Tao,LI Yang-hai,MEI Hai-long.The Different Expansion Analysis of HP and IP Cylinders in 300 MW Unit from Shanghai Turbine Company[J].Hubei Electric Power,2010,34(6):34-36.
Authors:XU Tao  LI Yang-hai  MEI Hai-long
Affiliation:1.Hubei Electric Power Testing & Research Institute,Wuhan 430077,China;2.Hubei Hanxin Power Generation Limited Corporation,Hanchuan Hubei 431614,China)
Abstract:The starting process of HP and IP cylinders in 300 MW unit from Shanghai turbine Company.was introduced.During the starting process of the unit,the expansion problems in each stage were introduced and theoretically analysed.These analyses provide reference of other similar 300 MW turbines.
Keywords:300 MW unit  HP and IP cylinders  different expansion