谈预应力管桩断桩原因及处理方案与预防措施
引用本文:杨昆,钟保蒙,雷兵荣. 谈预应力管桩断桩原因及处理方案与预防措施[J]. 山西建筑, 2011, 37(30): 59-60
作者姓名:杨昆  钟保蒙  雷兵荣
作者单位:长江勘测规划设计研究有限责任公司,湖北武汉,430010
摘    要:从场地、地质、桩基施工、基础开挖等方面对预应力管桩断桩进行原因分析,并提出了相应的预防措施和断桩处理方案,从而尽可能地减少预应力管桩的质量缺陷,提高工程质量。

关 键 词:预应力管桩  断桩  原因  预防措施

On reasons for broken piles of prestressed pipe piles and treatment scheme and precautious measures
YANG Kun ZHONG Bao-meng LEI Bing-rong. On reasons for broken piles of prestressed pipe piles and treatment scheme and precautious measures[J]. Shanxi Architecture, 2011, 37(30): 59-60
Authors:YANG Kun ZHONG Bao-meng LEI Bing-rong
Affiliation:YANG Kun ZHONG Bao-meng LEI Bing-rong
Abstract:From the field,the geology,the construction of the pile foundation,and the foundation excavation,the paper analyzes the reasons for the broken piles of the prestressed piles,and points out the respective precautious measures and treatment schemes for the broken piles,so as to reduce the quality shortage of the prestressed pipe piles and improve the engineering quality.
Keywords:prestressed pipe pile  broken pile  reasons  precautious measures  